The Challenge
The Fish Creek Wastewater Treatment Plant required boiler replacements and facility upgrades to maintain reliable operations and meet performance requirements. Key project oversight challenges included:
- Critical facility equipment replacement requiring coordination with ongoing wastewater treatment operations
- Boiler system installation requiring precise mechanical work and code compliance
- Quality control and verification to ensure systems would perform reliably for critical facility operations
- Invoice verification to ensure contractor billing accurately reflected work completed and materials supplied
- Minimal disruption to wastewater treatment operations during replacement work
- Independent verification to protect owner interests and ensure contractor accountability
The client needed experienced inspection services and invoice verification to ensure quality installation and accurate contractor billing for this critical facility upgrade.